Monday, April 13, 2020

Professional Scrum Master question answers


Professional Scrum Master question and answers ( PSM1)

Question:
What is the input to the Sprint Planning?
Answer :
The input to the Sprint Planning is the Product Backlog, the latest product Increment, projected capacity of the Development Team during the Sprint, and past performance of the Development Team.


Question:
Scrum is founded on
Answer :
Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge comes from experience and making decisions based on what is known.


Question:
Who is allowed to change the Sprint Backlog during the Sprint?
Answer :
Only the Development Team can change its Sprint Backlog during a Sprint. The Sprint Backlog is a highly visible, real-time picture of the work that the Development Team plans to accomplish during the Sprint, and it belongs solely to the Development Team.


Question:
What are the characteristics of a Development Team?
Answer :
Development Teams have the following characteristics:
They are self-organizing. No one (not even the Scrum Master) tells the Development Team how to turn Product Backlog into Increments of potentially releasable functionality;
Development Teams are cross-functional, with all of the skills as a team necessary to create a product Increment;
Scrum recognizes no titles for Development Team members other than Developer, regardless of the work being performed by the person; there are no exceptions to this rule;
Scrum recognizes no sub-teams in the Development Team, regardless of particular domains that need to be addressed like testing or business analysis; there are no exceptions to this rule; and,
Individual Development Team members may have specialized skills and areas of focus, but accountability belongs to the Development Team as a whole.


Question:
A time-box for each Scrum event.
Answer :
Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint. For shorter Sprints, the event is usually shorter.
The Daily Scrum is a 15-minute time-boxed event for the Development Team to synchronize activities and create a plan for the next 24 hours.
Sprint Review is a four-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter.
Sprint Retrospective is a three-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter.


Question:
Who has the authority to cancel the Sprint?
Answer :
Only the Product Owner has the authority to cancel the Sprint, although he or she may do so under influence from the stakeholders, the Development Team, or the Scrum Master.


Question:
What part of the capacity of the Development Team does Product Backlog refinement usually consume?
The Scrum Team consists of
Answer :
The Scrum Team consists of a Product Owner, the Development Team, and a Scrum Master


Question:
Please, select a time-box for each Scrum event.
Answer :
Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint. For shorter Sprints, the event is usually shorter.
The Daily Scrum is a 15-minute time-boxed event for the Development Team to synchronize activities and create a plan for the next 24 hours.
Sprint Review is a four-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter.
Sprint Retrospective is a three-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter.


Question:
Who participates in the Sprint Planning?
Answer :
The work to be performed in the Sprint is planned at the Sprint Planning. This plan is created by the collaborative work of the entire Scrum Team.


Question:
Who is allowed to participate in the Daily Scrum?
Answer :
The Scrum Master enforces the rule that only Development Team members participate in the Daily Scrum. Other people could attend the meeting, but cannot participate


Question:
What is the Sprint Backlog?
Answer :
The Sprint Backlog is the set of Product Backlog items selected for the Sprint, plus a plan for delivering the product Increment and realizing the Sprint Goal.


Question:
Who is responsible for all estimates in the Product Backlog?
Answer :
The Development Team is responsible for all estimates in the Product Backlog. The Product Owner may influence the Development Team by helping it understand and select trade-offs, but the people who will perform the work make the final estimate.


Question:
What happens during the Sprint?
It is normal to have a “hardening” Sprint to remove all technical debt and prepare the Product for upcoming release.
Answer :
It is not normal. Development Teams deliver an Increment of product functionality every Sprint. This Increment is usable, so a Product Owner may choose to immediately release it. So, there is nothing to prepare. Each increment contains only “Done” functionality that could be released immediately


Question:
How does the Scrum Master serve the Organization?
Answer :
The Scrum Master serves the organization in several ways, including:
Leading and coaching the organization in its Scrum adoption;
Planning Scrum implementations within the organization;
Helping employees and stakeholders understand and enact Scrum and empirical product development;
Causing change that increases the productivity of the Scrum Team; and,
Working with other Scrum Masters to increase the effectiveness of the application of Scrum in the organization.


Question:
Is it allowed to skip the Daily Scrum if there is nothing interesting to tell about?
Answer :
Each event in Scrum is a formal opportunity to inspect and adapt something. These events are specifically designed to enable critical transparency and inspection. Failure to include any of these events results in reduced transparency and is a lost opportunity to inspect and adapt.


Question:
Who is responsible for crafting the Sprint Goal at the Sprint Planning?
Answer :
After the Development Team forecasts the Product Backlog items it will deliver in the Sprint, the Scrum Team crafts a Sprint Goal.


Question:
Could the Sprint Planning be finished if only work planned for the first days of the Sprint is decomposed to units of one day or less?
Answer :
The Scrum Guide requires only the work planned for the first days of the Sprint is decomposed by the end of the Sprint Planning, often to units of one day or less. However, the Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a self-organizing team to accomplish the Sprint Goal and create the anticipated Increment.


Question:
What does Burn-down Chart show?
Answer :
Burn-down chart shows the evolution of remaining effort against time.


Question:
Scrum does not allow additional meetings that are not defined in Scrum.
Answer :
Scrum allows additional meetings if they facilitate achieving the Sprint Goal.


Question:
During each Sprint Retrospective the Scrum Team reviews the Definition of Done and changes it if necessary.
Answer :
During each Sprint Retrospective, the Scrum Team plans ways to increase product quality by adapting the definition of “Done” as appropriate.


Question:
What is the Sprint Retrospective?
Answer :
The Sprint Retrospective is an opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint.


Question:
What are the formal Scrum events for inspection and adaptation?
Answer :
Scrum prescribes four formal events for inspection and adaptation:
Sprint Planning
Daily Scrum
Sprint Review
Sprint Retrospective


Question:
What happens during the Sprint?
Answer :
During the Sprint:
No changes are made that would endanger the Sprint Goal;
Quality goals do not decrease; and,
Scope may be clarified and re-negotiated between the Product Owner and Development Team as more is learned


Question:
The purpose of the Sprint Retrospective is to:
Answer :
The purpose of the Sprint Retrospective is to:
Inspect how the last Sprint went with regards to people, relationships, process, and tools;
Identify and order the major items that went well and potential improvements; and,
Create a plan for implementing improvements to the way the Scrum Team does its work.


Question:
Only the Product Owner and the Development Team participate in the Sprint Planning. There is nothing to do for the Scrum Master.
Answer :
The work to be performed in the Sprint is planned at the Sprint Planning. This plan is created by the collaborative work of the entire Scrum Team.


Question:
What belongs solely to the Development Team?
Answer :
Only the Development Team can change its Sprint Backlog during a Sprint. The Sprint Backlog is a highly visible, real-time picture of the work that the Development Team plans to accomplish during the Sprint, and it belongs solely to the Development Team.


Question:
Definition of “Done” is created during the first Sprint and remains unchanged until the Product release.
Answer :
False. During each Sprint Retrospective, the Scrum Team plans ways to increase product quality by adapting the definition of “Done” as appropriate.


Question:
It is a good practice to have at least two Product Owners on big projects.
Answer :
The Product Owner is one person, not a committee, but the Product Owner may represent the desires of a committee in the Product Backlog.


Question:
How frequently should scrum users inspect Scrum artifacts and progress toward a Sprint Goal?
Answer :
Scrum users must frequently inspect Scrum artifacts and progress toward a Sprint Goal to detect undesirable variances. Their inspection should not be so frequent that inspection gets in the way of the work. Inspections are most beneficial when diligently performed by skilled inspectors at the point of work.


Question:
Other people than the Scrum Team can attend the Sprint Planning in order to provide technical or domain advice.
Answer :
The Development Team may also invite other people to attend in order to provide technical or domain advice.


Question:
What comprises Scrum?
Answer :
The Scrum framework consists of Scrum Teams and their associated roles, events, artifacts, and rules. Each component within the framework serves a specific purpose and is essential to Scrum’s success and usage.


Question:
The Scrum Master does the following regarding the Daily Scrum:
Answer :
The Scrum Master
Ensures that the Development Team has the meeting, but the Development Team is responsible for conducting the Daily Scrum.
Teaches the Development Team to keep the Daily Scrum within the 15-minute time-box.
Enforces the rule that only Development Team members participate in the Daily Scrum


Question:
Who participates in the Sprint Planning?
Answer :
The work to be performed in the Sprint is planned at the Sprint Planning. This plan is created by the collaborative work of the entire Scrum Team.


Question:
Who is allowed to participate in the Daily Scrum?
Answer :
The Scrum Master enforces the rule that only Development Team members participate in the Daily Scrum. Other people could attend the meeting, but cannot participate


Question:
What are Product Backlog features?
Answer :
A Product Backlog is never complete. The earliest development of it only lays out the initially known and best-understood requirements. The Product Backlog evolves as the product and the environment in which it will be used evolves. The Product Backlog is dynamic; it constantly changes to identify what the product needs to be appropriate, competitive, and useful. As long as a product exists, its Product Backlog also exists


Question:
Who has the authority to cancel the Sprint?
Answer :
Only the Product Owner has the authority to cancel the Sprint, although he or she may do so under influence from the stakeholders, the Development Team, or the Scrum Master.


Question:
Who is responsible for all estimates in the Product Backlog?
Answer :
The Development Team is responsible for all estimates in the Product Backlog. The Product Owner may influence the Development Team by helping it understand and select trade-offs, but the people who will perform the work make the final estimate


Question:
What is Scrum?
Answer :
A framework within which people can address complex adaptive problems, while delivering valuable products.


Question:
How does the Scrum Master help the Product Owner?
Answer :
The Scrum Master serves the Product Owner in several ways, including:
Finding techniques for effective Product Backlog management;
Helping the Scrum Team understand the need for clear and concise Product Backlog items;
Understanding product planning in an empirical environment;
Ensuring the Product Owner knows how to arrange the Product Backlog to maximize value;
Understanding and practicing agility; and,
Facilitating Scrum events as requested or needed.


Question:
How does Definition of “Done” help to the Scrum Team?
Answer :
DoD is used to assess when work is complete on the product Increment
Guides the Development Team in knowing how many Product Backlog items it can select during a Sprint Planning
DoD ensures artifact transparency


Question:
Could the Product Owner and the Scrum Master be a part of the Development Team?
Answer :
Yes. Scrum does not prohibit the Product Owner or the Scrum Master do development work. However, it is not the best practice because it could create a conflict of interest.


Question:
The Scrum Team consists of
Answer :
The Scrum Team consists of a Product Owner, the Development Team, and a Scrum Master.


Question:
What is the result of the Sprint Review?
Answer :
The result of the Sprint Review is a revised Product Backlog that defines the probable Product Backlog items for the next Sprint. The Product Backlog may also be adjusted overall to meet new opportunities.


Question:
What are the Scrum Artifacts?
Answer :
The Scrum artifacts are Product Backlog, Sprint Backlog and Increment.


Question:
What provides guidance to the Development Team on why it is building the Increment?
Answer :
The Sprint Goal is an objective set for the Sprint that can be met through the implementation of Product Backlog. It provides guidance to the Development Team on why it is building the Increment.


Question:
Who is responsible for creation of the Definition of “Done”?
Answer :
If the definition of “done” for an increment is part of the conventions, standards or guidelines of the development organization, all Scrum Teams must follow it as a minimum. If “done” for an increment is not a convention of the development organization, the Development Team of the Scrum Team must define a definition of “done” appropriate for the product. If there are multiple Scrum Teams working on the system or product release, the development teams on all of the Scrum Teams must mutually define the definition of “Done.”


Question:
Who is responsible for the monitoring of the remaining work towards the Project Goal?
Answer :
The Product Owner tracks total work remaining at least every Sprint Review. The Product Owner compares this amount with work remaining at previous Sprint Reviews to assess progress toward completing projected work by the desired time for the goal. This information is made transparent to all stakeholders.


Question:
If an item in the Sprint Backlog cannot be finished by the end of the Sprint (it turned out there is a lot more work to do than was estimated), the Sprint is cancelled.
Answer :
The Sprint is cancelled only in the case if the Sprint Goal became obsolete. If some work could not be done, the Sprint Backlog should be re-negotiated between the Product Owner and Development Team.


Question:
Who is allowed to make changes in the Product Backlog?
Answer :
The Product Owner is the sole person responsible for the Product Backlog. However, he or she can delegate some work related to product backlog management to the Development Team.


Question:
All Development Teams working on the same Product should use the same Product Backlog.
Answer :
Multiple Scrum Teams often work together on the same product. One Product Backlog is used to describe the upcoming work on the product.


Question:
What should be taken into account for the Definition of “Done”?
Answer :
If the definition of “done” for an increment is part of the conventions, standards or guidelines of the development organization, all Scrum Teams must follow it as a minimum. If “done” for an increment is not a convention of the development organization, the Development Team of the Scrum Team must define a definition of “done” appropriate for the product. If there are multiple Scrum Teams working on the system or product release, the development teams on all of the Scrum Teams must mutually define the definition of “Done.”


Question:
The Scrum Master is focused primarily on the Scrum Team and usually does not care about those outside the Scrum Team.
Answer :
The Scrum Master is a servant-leader for the Scrum Team. The Scrum Master helps those outside the Scrum Team understand which of their interactions with the Scrum Team are helpful and which aren’t. The Scrum Master helps everyone change these interactions to maximize the value created by the Scrum Team.


Question:
What happens when a Sprint is cancelled?
Answer :
When a Sprint is cancelled, any completed and “Done” Product Backlog items are reviewed. If part of the work is potentially releasable, the Product Owner typically accepts it. All incomplete Product Backlog Items are re-estimated and put back on the Product Backlog.


Question:
All the Scrum Teams working on the same product should have the same Sprint length.
Answer :
False. Scrum does not require having aligned Sprints for multiple teams.


Question:
The Sprint Backlog is created at the Sprint Planning. It is prohibited to add new work into the Sprint Backlog later by the Development Team.
Answer :
The Development Team modifies the Sprint Backlog throughout the Sprint, and the Sprint Backlog emerges during the Sprint. This emergence occurs as the Development Team works through the plan and learns more about the work needed to achieve the Sprint Goal. As new work is required, the Development Team adds it to the Sprint Backlog.


Question:
Who is responsible for tracking the total work remaining in the Sprint Backlog to project the likelihood of achieving the Sprint Goal?
Answer :
At any point in time in a Sprint, the total work remaining in the Sprint Backlog can be summed. The Development Team tracks this total work remaining at least for every Daily Scrum to project the likelihood of achieving the Sprint Goal. By tracking the remaining work throughout the Sprint, the Development Team can manage its progress.


Question:
What does Product Backlog management include?
Answer :
Product Backlog management includes:
Clearly expressing Product Backlog items;
Ordering the items in the Product Backlog to best achieve goals and missions;
Optimizing the value of the work the Development Team performs;
Ensuring that the Product Backlog is visible, transparent, and clear to all, and shows what the Scrum Team will work on next; and,
Ensuring the Development Team understands items in the Product Backlog to the level needed.


Question:
Who is responsible for managing the Product Backlog?
Answer :
The Product Owner is the sole person responsible for managing the Product Backlog.


Question:
What is the Sprint Backlog?
Answer :
The Sprint Backlog is the set of Product Backlog items selected for the Sprint, plus a plan for delivering the product Increment and realizing the Sprint Goal.


Question:
What are the two essential features a Scrum Team should possess?
Answer :
Scrum Teams are self-organizing and cross-functional. Self-organizing teams choose how best to accomplish their work, rather than being directed by others outside the team. Cross-functional teams have all competencies needed to accomplish the work without depending on others not part of the team.


Question:
What is the input to the Sprint Planning?
Answer :
The input to the Sprint Planning is the Product Backlog, the latest product Increment, projected capacity of the Development Team during the Sprint, and past performance of the Development Team.


Question:
What is the Increment?
Answer :
The Increment is the sum of all the Product Backlog items completed during the Sprint and the value of the increments of all previous Sprints.


Question:
In which meetings the Key Stakeholders are allowed to participate?
Answer :
The Key Stakeholders are allowed to participate only in the Sprint Review meeting. However, any member of the Scrum Team can interact with them any time.


Question:
Who is responsible for the Product Backlog?
Answer :
The Product Owner is responsible for the Product Backlog, including its content, availability, and ordering.


Question:
Imagine you are a Scrum Master. There are 10 professionals (developers and QAs) and the Product Owner. How to distribute people between development teams? Choose all applicable variants:
3 teams of 4, 3 and 3 people (each team is cross-functional)
2 teams of 6 and 4 people (the professionals after a short meeting decided this is the best variant)
2 teams of 6 and 4 people (because it is good to have all the QAs in a separate team)
1 team of 10 people (because there is no reason to divide)
Answer : : A & B
Optimal Development Team size is small enough to remain nimble and large enough to complete significant work within a Sprint. Fewer than three Development Team members decrease interaction and results in smaller productivity gains. Having more than nine members requires too much coordination. The Product Owner and Scrum Master roles are not included in this count unless they are also executing the work of the Sprint Backlog.


Question:
What are the three pillars that uphold Scrum?
Answer :
Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge comes from experience and making decisions based on what is known. Three pillars uphold every implementation of empirical process control: transparency, inspection, and adaptation.


Question:
What does Cone of Uncertainty show?
Answer :
The Cone of Uncertainty describes the evolution of the amount of uncertainty during a project.


Question:
What are the three most applicable characteristics of the Product Owner?
Answer :
Product Value Maximizer
Lead Facilitator of Key Stakeholder Involvement
Product Marketplace Expert


Question:
Please, check all opportunities to inspect and adapt.
Answer :
Other than the Sprint itself, which is a container for all other events, each event in Scrum is a formal opportunity to inspect and adapt something. These events are specifically designed to enable critical transparency and inspection.


Question:
What is the order of items in the Product Backlog?
Answer :
The Product Owner is responsible for placing the most valuable and clear items at the top of the Product Backlog.


Question:
The Daily Scrum time-box depends on the size of the Development team.
Answer :
The Daily Scrum is a 15-minute time-boxed event for the Development Team of any size.


Question:
Who is responsible for coping with incomplete artifact transparency?
Answer :
The Scrum Master’s job is to work with the Scrum Team and the organization to increase the transparency of the artifacts. This work usually involves learning, convincing, and change.


Question:
If an inspector determines that one or more aspects of a process deviate outside acceptable limits when an adjustment must be made?
Answer :
If an inspector determines that one or more aspects of a process deviate outside acceptable limits, and that the resulting product will be unacceptable, the process or the material being processed must be adjusted. An adjustment must be made as soon as possible to minimize further deviation.


Question:
How much time does the Sprint Planning take?
Answer :
Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint.


Question:
Who participates in the Sprint Review?
Answer :
During the Sprint Review, the Scrum Team and stakeholders collaborate about what was done in the Sprint. Based on that and any changes to the Product Backlog during the Sprint, attendees collaborate on the next things that could be done to optimize value.


Question:
Who is allowed to change the Sprint Backlog during the Sprint?
Answer :
Only the Development Team can change its Sprint Backlog during a Sprint. The Sprint Backlog is a highly visible, real-time picture of the work that the Development Team plans to accomplish during the Sprint, and it belongs solely to the Development Team.


Question:
Scrum recommends using only those Scrum components and rules which suit most for a particular project.
Answer :
Each component within the Scrum framework serves a specific purpose and is essential to Scrum’s success and usage.


Question:
What are the three main questions each member of the Development Team should answer at the Daily Scrum?
Answer :
During the Daily Scrum, the Development Team members explain:
What did I do yesterday that helped the Development Team meet the Sprint Goal?
What will I do today to help the Development Team meet the Sprint Goal?
Do I see any impediment that prevents me or the Development Team from meeting the Sprint Goal?


Question:
Select the two meetings in which people outside the Scrum Team are allowed to participate.
Answer :
The Development Team may invite other people to attend the Sprint Planning in order to provide technical or domain advice.
The Product Owner is responsible for inviting the Key Stakeholders to the Sprint Review meeting


Question:
How does the Scrum Master serve the Development Team?
Answer :
The Scrum Master serves the Development Team in several ways, including:
Coaching the Development Team in self-organization and cross-functionality;
Helping the Development Team to create high-value products;
Removing impediments to the Development Team’s progress;
Facilitating Scrum events as requested or needed; and,
Coaching the Development Team in organizational environments in which Scrum is not yet fully adopted and understood.


Question:
Scrum does not describe agile processes and techniques.
Answer :
Scrum is not a process or a technique for building products; rather, it is a framework within which you can employ various processes and techniques.


Question:
Sort Scrum events in the right order.
Answer :
A sprint begins with Sprint Planning, then there are several Daily Scrum meetings following by Sprint Review and then Sprint Retrospective.


Question:
What are the questions the Sprint Planning answers?
Answer :
Sprint Planning answers the following:
What can be delivered in the Increment resulting from the upcoming Sprint?
How will the work needed to deliver the Increment be achieved?


Question:
What could be a source of requirements for any changes to be made to the product?
Answer :
The Product Backlog is an ordered list of everything that might be needed in the product and is the single source of requirements for any changes to be made to the product.


Question:
What are the characteristics of a Development Team?
Answer :
Development Teams have the following characteristics:
They are self-organizing. No one (not even the Scrum Master) tells the Development Team how to turn Product Backlog into Increments of potentially releasable functionality;
Development Teams are cross-functional, with all of the skills as a team necessary to create a product Increment;
Scrum recognizes no titles for Development Team members other than Developer, regardless of the work being performed by the person; there are no exceptions to this rule;
Scrum recognizes no sub-teams in the Development Team, regardless of particular domains that need to be addressed like testing or business analysis; there are no exceptions to this rule; and,
Individual Development Team members may have specialized skills and areas of focus, but accountability belongs to the Development Team as a whole.


Question:
A time-box for each Scrum event.
Answer :
Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint. For shorter Sprints, the event is usually shorter.
The Daily Scrum is a 15-minute time-boxed event for the Development Team to synchronize activities and create a plan for the next 24 hours.
Sprint Review is a four-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter.
Sprint Retrospective is a three-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter.


Question:
It is a good practice to have from time to time a special technical Sprint that consists only of tasks removing the technical debt without implementing any new functionality.
Answer :
It is prohibited. The purpose of each Sprint is to deliver Increments of potentially releasable functionality that adhere to the Scrum Team’s current definition of “Done.”


Question:
What part of the capacity of the Development Team does Product Backlog refinement usually consume?
Answer :
Product Backlog refinement usually consumes no more than 10% of the capacity of the Development Team


Question:
The Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a self-organizing team to accomplish the Sprint Goal and create the anticipated Increment.
Answer :
By the end of the Sprint Planning, the Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a self-organizing team to accomplish the Sprint Goal and create the anticipated Increment.


Question:
What are the three main qualities the team model in Scrum is designed to optimize?
Answer :
The team model in Scrum is designed to optimize flexibility, creativity, and productivity.


Question:
Who creates the increment?
Answer :
Only members of the Development Team create the Increment.

This is completely up to the self-organized Development Team to decide on the way they work and on the technical aspects of the project.

Question:
Which two (2) things does the Development Team do during the first Sprint?
Answer :
The heart of Scrum is a Sprint, a time-box of one month or less during which a "Done", useable, and potentially releasable product Increment is created. This applies to every Sprint


Question:
Who is required to attend the Daily Scrum?

Answer :
Only the people doing the work described on the Sprint Backlog need to inspect and adapt at the Daily Scrum. If the Scrum Master or Product Owner is also on the Development Team, they will need to be at the Daily Scrum. Otherwise, the Scrum Master simply has to make sure the Development Team knows how to conduct a Daily Scrum and does so.


Question:
The purpose of a Sprint is to produce a done increment of working product.(True\False)
Answer :
The heart of Scrum is a Sprint, a time-box of one month or less during which a "Done", usable, and potentially releasable product Increment is created.


Question:
The length of a Sprint should be:

All of these choices are appropriate considerations in determining the length of a Sprint.
Short enough to keep the business risk acceptable to the Product Owner.
Short enough to be able to synchronize the development work with other business events.
No more than one month.


Question:
An organization has decided to adopt Scrum, but management wants to change the terminology to fit with terminology already used. What will likely happen if this is done?
Answer :
Without a new vocabulary as a reminder of the change, very little change may actually happen.
The organization may not understand what has changed with Scrum and the benefits of Scrum may be lost.
Management may feel less anxious.


Question:
Development Team membership should change:
Answer :
As needed, while taking into account a short term reduction in productivity.
Teams typically go through some steps before achieving a state of increased performance. Changing membership typically reduces cohesion, affecting performance and productivity in the short term.


Question:
What does it mean to say that an event has a time-box?
Answer :
Time-boxed events are events that have a maximum duration.


Question:
Why is the Daily Scrum held at the same time and same place?
Answer :
The Daily Scrum is held at the same time and place each day to reduce complexity.


Question:
It is mandatory that the product increment be released to production at the end of each Sprint.
Answer :
The product increment should be usable and releasable at the end of every Sprint, but it does not have to be released.


Question:
When many Development Teams are working on a single product, what best describes the definition of "done?"
Answer :
Scrum requires an Increment to be releasable. This is an Increment of product. Many teams working on a single product are expected to deliver such an Increment


Question:
During a Sprint, a Development Team determines that it will not be able to finish the complete forecast. Who should be present to review and adjust the Sprint work selected?
Answer :
During the Sprint, scope may be clarified and re-negotiated between the Product Owner and Development Team as more is learned.


Question:
Who has the final say on the order of the Product Backlog?

Answer :
The Product Owner is the sole person responsible for managing the Product Backlog


Question:
When does the next Sprint begin?
Answer :
A new Sprint starts immediately after the conclusion of the previous Sprint.


Question:
When is a Sprint over?
Answer :
The duration of a Sprint is fixed and cannot be shortened or lengthened.


Question:
Who is responsible for managing the progress of work during a Sprint?
Answer :
The Development Team uses the Daily Scrum to inspect progress toward the Sprint Goal and to inspect how progress is trending toward completing the work in the Sprint Backlog.


Question:
Which statement best describes the Sprint Review?
Answer :
It is when the Scrum Team and stakeholders inspect the outcome of a Sprint and figure out what to do next.
Every event in Scrum, besides the Sprint which is a container for the other events, is an opportunity to Inspect AND Adapt.


Question:
During the Daily Scrum, the Scrum Master's role is to:
Answer :
The Scrum Master ensures that the Development Team has the meeting, but the Development Team is responsible for conducting the Daily Scrum. The Scrum Master teaches the Development Team to keep the Daily Scrum within the 15-minute time-box. The Scrum Master enforces the rule that only Development Team members participate in the Daily Scrum.


Question:
How much work must a Development Team do to a Product Backlog item it selects for a Sprint?
Answer :
The purpose of each Sprint is to deliver Increments of potentially releasable functionality that adhere to the Scrum Team's current definition of "Done".


Question:
When multiple teams work together on the same product, each team should maintain a separate Product Backlog.
Answer :
False.Products have one Product Backlog, regardless of how many teams are used. Any other setup makes it difficult for the Development Team to determine what it should work on.


Question:
What are the two primary ways a Scrum Master keeps a Development Team working at its highest level of productivity?
Answer :
A Scrum Master is a servant-leader for the Development Team. Facilitation and removing impediments serves a team in achieving the best productivity possible.


Question:
What is the role of Management in Scrum?
Answer :
Support the Product Owner with insights and information into high value product and system capabilities. Support the Scrum Master to cause organizational change that fosters empiricism, self-organization, bottom-up intelligence, and intelligent release of software.
Management has no active role in the actual product development through Scrum. However, management external to the Scrum team is incredibly important in setting the vision and strategy to guide the overall direction of the organization.


Question:
Scrum does not have a role called "project manager."
Answer :
True.A Scrum Team has a Scrum Master, a Product Owner and a Development Team. As a whole they have all controls needed.


Question:
What is the main reason for the Scrum Master to be at the Daily Scrum?
Answer :
The Scrum Master enforces the rule that only Development Team members participate in the Daily Scrum.


Question:
The time-box for the Sprint Planning meeting is?
Answer :
Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint. For shorter Sprints, the event is usually shorter.


Question:
Which statement best describes a Product Owner's responsibility?
Answer :
The Product Owner is responsible for maximizing the value of the product and the work of the Development Team.


Question:
The maximum length of the Sprint Review (its time-box) is:
Answer :
Sprint Review is a four-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter.


Tuesday, April 07, 2020

Google 3D Animals for kids | list of AR animals | 3D animals in Android ...




3D Animals in Google Search

Google unveiled the fantastic new 3D Animals augmented reality filters for Search.

The new features on your smartphone to place 3D rendered creatures within your camera viewfinder in real-life scale.

With millions of children around the globe not currently able to go to school due to quarantine and lockdown procedures due to the COVID-19 coronavirus outbreak, this might be a great way to give them an interesting home-schooling lesson without having to leave the house — or invite any furry friends in to make a real mess.

Require :

 * An Android smartphone running Android 7.0 or higher / iPhone running iOS 11 or later

 * Google Chrome for Android/iOS

The full list of 3D Animals within Google Search as follows:


  • Tiger
  • Lion
  • Dog
  • Snake
  • Octopus
  • Shark
  • Alligator
  • Angler Fish
  • Brown Bear
  • Cat
  • Cheetah
  • Duck
  • Eagle
  • Penguin
  • Giant Panda
  • Goat
  • Horse
  • Macaw
  • Pug
  • Rottweiler
  • Great White Shark
  • Shetland Pony
  • Turtle
  • Wolf
  • Panda


Now, it's became a small Zoo.

If you’re wanting to keep yourself or your kids occupied, it’s as easy as opening Google Chrome on your smartphone and searching for any of the AR animals above. You don’t even have to view them in AR, you can see each animal in 3D within your Google Search page too

Let us know your favorite 3D animal down in the comments section below.


Saturday, March 28, 2020

NPTEL Python for Data Science Week 4 Assignment 4 answers |2020|99.9% ac...





Code : Assignment 4 code in google drive. If you are downloading this file , please subscribe and like . Advance Thanks.

https://drive.google.com/file/d/1dOZ-YHLRCaSq_l7ffW3b2u5gAgnrUw9p/view


2020- NPTEL Python for Data Science Assignment 2 solutions| 100% correct...



Find the solutions\answers in this video for the below questions : 1)Which of the following sequence data type is defined by enclosing the elements in parentheses ‘()’? 2)Which of the following statement is not valid about Numpy ‘Arrays’? 3)The command to access the last element from the array “a” is__ import array as arr a = arr.array('d', [2.5, 3.5, 4.5]) 4)Create an array ‘x’ with values 0 to 9 and find what is the command to extract the elements in the following sequence - array ([5,3,1])? 5)What will be the output after executing the following codes? x=(0,8,9,15,17,18) y=slice(1,-2) 6)The method used to increase the length of the list by number of elements in its argument. 7)The function that returns the indices of the sorted elements. 8)Create two tuples tuple=(2,4,6,3,7) tuple1=(1,2,3) Find out which of the following code does not work on a tuple 9)The command to find the number of elements in the following array “N” is import numpy as np N=np.array([24, None , 29, 'str', np.nan, 23,20,(),[], ...]) 10)Which of the following is not a valid syntax for creating a Set ‘M’ in Python? M = set([11,12],[13,14],[14,15]) 11)What will be the output after executing the following codes? S={12,13,14,15} S.intersection_update({17,13,14,16}) print(S) 12)Which of the following command returns the set of all elements from both sets, a and b? 13)What will be the output of ndarray.ndim attribute? 14)For dictionary d = {“plum ":0.66, "pears ":1.25,"oranges ":0.50, “apple”:0.75 }, which of the following statement correctly updates the price of oranges to 0.90? 15)Which of the following command(s) is/are used to join arrays? 16)What will be the output of the dictionary ‘c’? 17)The output of the code given below is n = [x*x for x in range(4)] print(n) 18)The output of the code given below is list = [2, 4, 6, 8] a = (x**3 for x in list) print(next(a)) 19)Which of the following is not possible in sequence datatypes? 20)Which of the following commands will give you a new numpy array with Boolean values? ======================================================= Subscribe jaganInfo channel to get more related videos. Thanks for your support to make more videos. ========================================================

NPTEL Python for Data Science Assignment 3 answers | 2020 Week 3 |99.9% ...



1)Pandas features a number of functions for reading data as a DataFrame object. Which of the following commands are valid? 2)Which of the following is a valid indexing option with DataFrames? 3)Which of the following function allows the use of ‘Lambda expression’ while querying the data? 4)While reading comma-separated values (csv) file into DataFrame., which of the following will be used to set the first column as the index column? 5)Read the given dataset “Tips.csv” as a dataframe “Data”. Which of the following command(s) is/are correct to extract the columns in the following sequence - Time, TotalBill, Tips? 6)Read the given excel sheet ‘Tips1.xlsx’ as a dataframe ‘Data1’. Identify which of the following command (s) is/are correct to merge the two data frames ‘Data’ and ‘Data1’ by columns? 7)Copy the 'Data2' dataframe as 'Data3' (Data3 = Data2.copy()) and identify the command to find the total tips received across Day’s from the dataframe ‘Data3’? 8)Copy the 'Data2' dataframe as 'Data3' (Data3 = Data2.copy()) and find which of the following command (s) gives the count of the Time (‘Dinner' or 'Lunch') across gender? 9)Which of the following plot is a visual representation of the statistical five-number summary of a data? 10)Which of the following statement is not true about histograms? 11)If you have column with categorical variables, which will be the appropriate method to fill in the NaN’s present in the column? 12)Which of the following is not the right command to fill NaN values? 13)For the given dataframe “Data3” plot a histogram for the variable ‘TotalBill’ to check which range has the highest frequency 14)For the given dataframe “Data3” draw a bar chart for the variable “Day”. Identify the category with the maximum count 15)Find the mean of the ‘TotalBill’, ‘Tips’ and ‘Size’ across Days from the dataframe ‘Data3’? 16)On which day sum of the total bill was maximum? 17)What will be the output of ‘a’ and ‘b’? 18) n Pandas library, Dataframe class provides a member function to find duplicate rows based on all columns. Identify the right option. 19)What does the following command do? df.dropna(axis=0, how='all') ? 20)Correlation between two variables X&Y is 0.85. Now, after adding the value 2 to all the values of X, the correlation co-efficient will be --------------------- Practice Assignment 3 --------------------- 1) Which of the following can be inferred from scatter plot of ‘mpg’ (Miles per gallon) vs ‘wt’ (Weight of car) from the dataset mtcars.csv? Answer : a) As weight of the car increases, the mpg decreases 2) Plot a boxplot for “price” vs “cut” from the dataset “diamond.csv”. Which of the categories under “cut” have the highest median price? Answer : d) Fair 3) In the churn.csv dataframe, what are the total no. of missing values for the variable TotalCharges? Answer : c) 15 4) The command used for line plot from the package Matplotlib? Answer : a) plot() 5) The probability of two different events occurring at the same time is known as Answer : c) Joint probability

Sainik School 2020 Entrance Exam English Class 6 Question and Answers



This video contains solutions to All India Sainik School Entrance Exam 2020 class 6 for English Grammar questions with answers

You can get Sainik School Entrance Exam 2020 General knowledge questions from the below link:
https://youtu.be/EclZFjwdRTU

Sainik School Entrance Exam General Knowledge Class 6 Question and Answers

This video contains solutions to All India sainik school entrance exam 2020 class 6 for General knowledge questions. You can get Sainik School Entrance Exam 2020 English Grammar questions from the below link: https://youtu.be/JTX-lcfpg40 The following G.K questions answered in this video. Please watch , like and subscribe. 1) Which is biggest desert in the world? 2)Manas national park is located in the state of? 3)which of these grows from the roots ? 4)Sahyadris is also known as? 5)The gas filled in a weather balloons is 6)Growing children need more of 7)Which gas is dissolved under pressure in soft drinks? 8)who is the lowest ranked Air force officer among these 9) which of the following is a national festival 10)Dr.Amartya Sen won Nobel Prize in which field 11) The imaginnary line drawn half way between Nort Pole and South Pole 12) The largest Island in the world is 13) The coldest place in world, lying in the south frigid zone is 14) who invented telephone in 1876 15)'Ghoomar' is a popular folk dance of which of the folowing state 16)Black soil is also known as 17) PV sindhu is associated with which sports 18) The space programmer of Govt of india is looked after by 19) Bhakranangal project is built on the river 20) who is known as a Iron Man of India 21) The longest river in south india is 22) which planet is known as moorning star as well as evening star 23) which article of constitution provides indian citizen Right to Equality 24) Narora nuclear power plant is located in the state of 25) which of the following diseases spreads through contaminated food and water

Monday, March 23, 2020

Data Visualization using python libraries | matplotlib I Seaborn | plotl...





Visualization is any technique for creating images, diagrams, or animations to communicate a message.
Types of Data Visualizations :
Explanatory:
Exploratory:

Python Visualisation Libraries
• Matplotlib
o
https://matplotlib.org/
• Pandas built-in plotting
• ggpy
o
https://github.com/yhat/ggpy
• Altair
o
https://altair-viz.github.io/
• Seaborn
o
https://seaborn.pydata.org/
• Plotly
o
https://plot.ly/python/
• Bokeh
o
https://bokeh.pydata.org/en/latest/
• HoloViews
o
http://holoviews.org/
• VisPy
o
http://vispy.org/
• Lightning
o
http://lightning-viz.org/

Visualization methods :
Distribution
It is commonly used at the initial stage of data exploration i.e. when we get started with understanding the variable. Variables are of two types: Continuous and Categorical. For continuous variable, we look at the center, spread, outlier. For categorical variable we look at frequency table.
Histogram : It is used for showing the distribution of continuous variables.
Box-Plot : It is used to display full range of variation from min to max and useful to identify outlier values.
Comparison
It is used to compare values across different categories.
Common charts to represent these information are Bar and Line chart.
Bar Chart : It is used to compare values across different categories
Line Chart : It is used to compare values over quantitative variable
Composition
It is used to show distribution of a variable across categories of another variable
Pie Chart : It can be created by passing the values representing each of the slices of the pie.
Relationship
It is widely used to understand the correlation between two or more continuous variables
Scatter Plot : It clearly shows the relationship between two variables

Demo 1 : Basic Plot
import matplotlib.pyplot as plt
plt.plot([1,2,4],[5,7,4])
plt.show()

Demo 2 : Basic Plot Legend Title Labels
import matplotlib.pyplot as plt
x,y = [1,2,4],[5,7,4]
x2,y2 = [1,2,5],[8,11,5]
plt.plot(x,y, label = "Firstline")
plt.plot(x2,y2, label = "Secondline")
plt.xlabel('X-axis label')
plt.ylabel('Y-axis label')
plt.title('Graph Title')
plt.legend()
plt.show()

Demo 3 : Bar Chart
import matplotlib.pyplot as plt
x = [2,4,6,8,10]
y = [6,7,8,2,4]
x2 = [1,3,5,7,9]
y2 = [7,8,2,4,2]
plt.bar(x, y, label="FirstBar", color='lightblue')
plt.bar(x2, y2, label="SecondBar", color='c')
plt.xlabel('Bar Number')
plt.ylabel('Bar Height')
plt.title('Graph: Two Bars')
plt.legend()
plt.show()

Demo 4 : Hist Chart
import matplotlib.pyplot as plt
population_ages = [22,55,62,45,21,22,34,42,42,4,99,102,110,120,122,130,111,151,115,112,80,75,65,54,44,42,48]
bins = [0,10,20,30,40,50,60,70,80,90,100,120]
plt.hist(population_ages, bins , histtype='bar', rwidth=0.8)
plt.xlabel('X-axis')
plt.ylabel('Y-axis')
plt.title('Graph: Hist Chart')
plt.legend()
plt.show()

Demo 5 : Scatter Plot
import matplotlib.pyplot as plt
x = [1,2,3,4,5,6,7,8]
y = [5,2,4,2,1,4,5,2]
plt.scatter(x,y,label='skitcat', color='r',s=250)
# google matplotlib marker option
plt.scatter(x,y,label='skitcat', color='r',s=200, marker = '*')
plt.xlabel('X-axis')
plt.ylabel('Y-axis')
plt.title('Graph: Scatter Plot')
plt.show()

Demo 6 : Stack Plot
import matplotlib.pyplot as plt
days = [1,2,3,4,5]
sleeping = [7,8,6,11,7]
eating = [2,3,4,3,2]
working = [7,8,7,2,2]
playing = [8,5,7,8,13]
plt.plot([],[],color = 'm',label = 'sleeping')
plt.plot([],[],color = 'c',label = 'eating')
plt.plot([],[],color = 'r',label = 'working')
plt.plot([],[],color = 'y',label = 'playing') # linewidth
plt.stackplot(days,sleeping,eating,working,playing ,colors =['m','c','r','y'])
plt.xlabel('X-axis')
plt.ylabel('Y-axis')
plt.legend()
plt.title('Graph: Stack Plot')
plt.show()

Demo 7 : Pie Charts
import matplotlib.pyplot as plt
days = [1,2,3,4,5]
sleeping = [7,8,6,11,7]
eating = [2,3,4,3,2]
working = [7,8,7,2,2]
playing = [8,5,7,8,13]
slices = [7,2,2,13]
activities = ['sleeping','eating','working','playing']
cols = ['m','c','r','g']
plt.pie(slices, labels = activities, colors=cols)
# startangle , shadow= , explode , autopct
plt.title('Graph: Pie Chart')
plt.show()

Demo 8 : Load Data from Files
import numpy as np
x, y = np.loadtxt('DemoData.txt', delimiter=',', unpack=True)
plt.plot(x,y, label='Loaded from file!')
plt.xlabel('X-Axis')
plt.ylabel('Y-Axis')
plt.title('Graph : Load Data from File')
plt.legend()
plt.show()

Demo 9 : Live Graphs
import matplotlib.pyplot as plt
import matplotlib.animation as animation
from matplotlib import style
style.use('fivethirtyeight')
fig = plt.figure()
ax1 = fig.add_subplot(1,1,1)
def animate(i):
graph_data = open('DemoData.txt','r').read()
lines = graph_data.split('\n')
xaxis = []
yaxis = []
for line in lines:
if len(line) greaterthan 1:
x, y =line.split(',')
xaxis.append(x)
yaxis.append(y)
ax1.clear()
ax1.plot(xaxis,yaxis)
ani = animation.FuncAnimation(fig, animate, interval=1000)
plt.show()

Wednesday, March 18, 2020

Non proctored Solutions Python for Data Science Question and Answers

Non proctored Solutions Python for Data Science Question and Answers Download required datasets here : Session 1 Dataset : lending_data.csv https://drive.google.com/file/d/1hHOTQiEVNwqahnYFpp6M5Wgimd3ZYRN1/view Session 2 Dataset : microlending_data.csv https://drive.google.com/file/d/1d_l4XwXED_fqs_1zPeHL_1HC08HJi1n9/view **** PLEASE SUBSCRIBE ...LIKE ****** Non Proctored exam Preparation #jaganinfo #unproctored #nonproctored #nptel #pythonfordatascience #datascience Subscribe if you gain some information from this useful video. Python for Data Science - Non Proctored exam Question and Answers - Revision for Exam This video is explained and executed to get the solutions . All The Best for EXAM ... Note: This video is not responsible for any error or mistakes for your assignments. I have watched the NPTEL course related videos and read the content from different knowledge sources.

Wednesday, February 26, 2020

NPTEL Introduction to Machine Learning Assignment solutions 10 11 12

NPTEL Introduction to Machine Learning Assignment 9 Unit 11 Week 9

NPTEL Introduction to Machine Learning Assignment 8 Unit 10 Week 8

NPTEL Introduction to Machine Learning Assignment 7 Unit 9 Week 7

NPTEL Introduction to Machine Learning Assignment 6 Unit 8 Week 6

Monday, March 01, 2010

Logica CMG Sharepoint Interview Questions

1.Advantages of infopath?

2.What iS the primary datasource for infopath form template?

3.Why shoud we go for content types?

4.On which location the Content Database is stored ?

5.Can we access content database or can we query content database?

6.How can we use User controls in Sharepoint site?

7.Web part lifecycle when the events will fire?

8.When the Webpart dll is placed in web application bin directory? How can we use that?

9.Difference between Webparts and user controls?

10.Difference between Webparts and InfoPath?

11.Difference between Site pages and Application pages? Which is the best ?

12.Types of workflows? What is the difference between sequential workflows and state machine workflows?

13.What is the default document size we can upload? Where we can change this in central admin?

14.Where to set Alerts in central admin application?

15.How caching implemented in sharepoint?

16.What are default roles added to site?

17.What is Ghosting and UnGhosting?

18.What are synchronous events and asynchronous events?

19.What are event receivers?

20.without coding how to restrict all the views while selecting ? it should not able to see in the list

21.What are group policies? Which policy can be added in the list (expiration policy,custom policy and many other policies)


21.Practical Question : in share point portal employees information is maintained. when he resigns, his data should be deleted after 4 years from the data of resignation? How can it be done.And suppose there is a criminal case on the employee, and police have asked details of that employee after 3 years and 364 days(i. e….. 1 day before 4th year. Now we don’t want to delete that employee details? What should we do? If the portal is on live? What would be the best choice? We should rewrite code or any other option?

Friday, February 26, 2010

Mail Server Settings

Incoming and Outgoing Mail Server Settings for Hotmail, Yahoo Mail, GMail, MSN,Lycos , AOL ,
Mail.com , Netscape Internet Service Mail ,Tiscali Mail  , Freeserve Mail ,Supanet Mail and moreinfo...


 Mail Server Settings

# Hotmail Settings

As other web based email services, Hotmail is using the HTTP protocol for connecting you to your mailbox. If you want to send and receive Hotmail emails using an email client software, then your software must support Hotmail HTTP access for your email account. Some email clients, such as Outlook Express or Microsoft Outlook, offer builtin support for Hotmail accounts, so you only have to select HTTP when you are asked to select your email account type and select Hotmail as the HTTP Mail Service Provider.

Mail Server Settings for Hotmail using the Microsoft Outlook Connector

If you are using Microsoft Outlook & the Outlook Connector, you can define your Hotmail account just like any regular POP3 email account:

      Hotmail Incoming Mail Server (POP3) - pop3.live.com (logon using Secure Password Authentification - SPA, mail server port: 995)

      Hotmail Outgoing Mail Server (SMTP) - smtp.live.com (SSL enabled, port 25)

# Yahoo! Mail Settings


Yahoo Mail offers standard POP3 access for receiving emails incoming through your Yahoo mailbox, by using your favorite email client software. To setup your email client for working with your Yahoo account, you need to select the POP3 protocol and use the following mail server settings:

      Yahoo Incoming Mail Server (POP3) - pop.mail.yahoo.com (port 110)

      Yahoo Outgoing Mail Server (SMTP) - smtp.mail.yahoo.com (port 25)

POP Yahoo! Mail Plus email server settings

      Yahoo Plus Incoming Mail Server (POP3) - plus.pop.mail.yahoo.com (SSL enabled, port 995)

      Yahoo Plus Outgoing Mail Server (SMTP) - plus.smtp.mail.yahoo.com (SSL enabled, port 465, use authentication)

# Google GMail Settings

The Google GMail service offers email client access for retrieving and sending emails through your Gmail account. However, for security reasons, GMail uses POP3 over an SSL connection, so make sure your email client supports encrypted SSL connections.

      Google Gmail Incoming Mail Server (POP3) - pop.gmail.com (SSL enabled, port 995)

      Outgoing Mail Server - use the SMTP mail server address provided by your local ISP or smtp.gmail.com (SSL enabled, port 465)

# MSN Mail Settings

The MSN email service allows you to use the MSN POP3 and SMTP servers to access your MSN mailbox.

      MSN Incoming Mail Server (POP3) - pop3.email.msn.com (port 110, using Secure Password Authentication - SPA)

      MSN Outgoing Mail Server - smtp.email.msn.com (select "My outgoing server requires authentication")

# Lycos Mail Settings

The Lycos Mail Plus service allows you to use POP3 and SMTP servers for accessing your Lycos mailbox.

      Lycos Mail Incoming Mail Server (POP3) - pop.mail.lycos.com (port 110)

      Outgoing Mail Server - smtp.mail.lycos.com or use your local ISP SMTP mail server

# AOL Mail Settings

The AOL email service is a web based system, designed for managing your AOL mailbox via HTTP IMAP access. Unlike Hotmail, you can use any email client to access your AOL mailbox, as long as it supports the IMAP protocol.

      AOL Incoming Mail Server (IMAP) - imap.aol.com (port 143)

      AOL Outgoing Mail Server - smtp.aol.com or use your local ISP SMTP mail server

# Mail.com Mail Settings

The Mail.com email service allows you to use POP3 and SMTP servers for accessing your Mail.com mailbox.

      Mail.com Mail Incoming Mail Server (POP3) - pop1.mail.com (port 110)

      Outgoing Mail Server - use your local ISP SMTP mail server

# Netscape Internet Service Mail Settings

The Netscape e-mail system is web-based, which means you can access their e-mail from any Internet connection. Netscape Internet Service also supports AOL® Communicator, Microsoft® Outlook, Microsoft® Outlook Express, and other POP3 e-mail software. The outgoing mail server needs SSL support, so make sure your email client software supports SSL connections over the SMTP protocol.

      Netscape Internet Service Incoming Mail Server (POP3) - pop.3.isp.netscape.com (port 110)

      Netscape Internet Service Outgoing Mail Server - smtp.isp.netscape.com (port 25, using a secure SSL connection)

# Tiscali Mail Settings

The Tiscali email service allows you to use POP3 and SMTP servers for accessing your Tiscali mailbox.

      Tiscali Incoming Mail Server (POP3) - pop.tiscali.com (port 110)

      Outgoing Mail Server - use your local ISP SMTP mail server

# Freeserve Mail Settings

The Freeserve email service allows you to use POP3 and SMTP servers for accessing your Freeserve mailbox.

      Freeserve Incoming Mail Server (POP3) - pop.freeserve.com (port 110)

      Outgoing Mail Server - use your local ISP SMTP mail server

# Supanet Mail Settings

The Supanet email service allows you to use POP3 and SMTP servers for accessing your Supanet mailbox.

      Supanet Incoming Mail Server (POP3) - pop.supanet.com (port 110)

      Outgoing Mail Server - use your local ISP SMTP mail server

Wednesday, February 24, 2010

BSNL Examination Question Paper

BSNL GE-JTO Recruitment Examination
Test Paper - VIII
1. When a inductive coil connected to a 200 V, 50Hz ac supply with 10A current flowing through it dissipates 1000 watts then which of the following will have least value in ohms-
a.) Resistance
b.) Reactance
c.) Impedance
d.) None

2 Oscillator crystal are made of –
a.) Silicon
b.) Germanium
c.) Quartz
d.) None

3. For small size, high frequency coils, the most common core material is-
a. )Air
b. )Ferrite
c.) Powdered ion
d.) Steel

4. If we have a parallel plate capacitor of plate area 'A' and plate separatoin t and having a capacity C and a metallic plate r of area A and of negligible thickness is introduced in thecapacitor at a distance from either of the two plates as shown in the given figure then the capacity of the capacitor will become –
a.)
b.)C
c.)2C
d.)4C

5. A superconductor is a –
a.)A material showing perfect conductivity and Meissner effect below a critical temperature
b.)A conductor having zero resistance
c.)A perfect conductor with highest di-magnetic susceptibility
d.)A perfect conductor which becomes resistance when the current density through it exceeds a critical value

6. When an inductor tunes at 200 KHz with 624 pF capacitor and at 600 KHz with 60.4 pF capacitor then the self capacitance of the inductor would be –
a)8.05 pF
b)10.05pF
c.)16.01pF
d.)20.01pF

7. Sparking occur when a load is switched off because the circuit has high –
a.)Inductance
b.)Capacitance
c.)Resistance
d.)None

8. Sparking between contacts can be reduced by inserting a –
a.)Resistance in the line
b.)Capacitor in series with contacts
c.)Capacitor in parallel with contacts
d.)None

9. RF amplifier of an A.M. receiver is normally biased in –
a.)Class 'A'
b.)Class 'b'
c.)Class 'C'
d.)None

10. The value of gate voltage for the operation of enhancement of only N channel MOSFET has to be –
a.)High positive
b.)High negative
c.)Low positive
d.)Zero

11. The input gate current of a FET is –
a.)a few microamperes
b.)negligibly small
c.)a few milliamperes
d.)a few amperes

12. In the following fig. with R = 30k, the value of current through 2 K resistor is –
a.)25 mA
b.)40 mA
c.)25/16 mA
d.)10 mA

13. A step recovery diode –
a.)has on extremely short recovery time
b.)conducts equally well in both directions
c.)is mainly used as a harmonic generator
d.)is an ideal rectifiers of high frequency signals

14. In order to get maximum undistorted output signal from CE amplifier with VCC 10V, the value of VCE (Q) should be approximately-
a.)0.1V
b.)5V
c.)10V
d) V

15. In a FET the electrode, which corresponds to collector in bipolar transistor, is –
a.)source
b.)drain
c.)gate
d.)none

16. The device which acts like an NPN and a PNP transistor connected base to base and emitter to collector is –
a.)Triac
b.)UJT
c.)Diac
d.)SCR

17. A typical optical fibre has –
a.)High refractive index core and low refractive index cladding
b.)Low refractive index core and high refractive index cladding
c.)Both a and b
d.)None

18. In the following figure circuit diagram of an op-amp based is shown. The ratio is equal to –
a.)9
b.)11
c.)10
d.)21

19. When a loud speaker is connected across the terminals A and B of the network shown in the fig. then its impedance to obtain maximum power dissipation in it will be –
a.)3 – j1
b.)3 + j9
c.)7.5 + j 2.5
d.)7.5 – j 2.5
BSNL Recruitment Exam Question Paper with sample aptitude / reasoning / technical questions free download here. Answers key / solutions coming shortly!
20. In the lattice network, the value of R for the maximum power transfer to the load –
a.)5
b.)6.5
c.)8
d.)9

21. For a lossy transmission line short circuited at the receiving end, the input impedance is given by (Z0 is the characteristic impedance, Ö is the propagation constant and l is the length of the line-
a.)Z0 cot h Öl
b.)Z0 cot Öl
c.)Z0 tan h.Ö l
d.) Z0 tan Öl

22. The approximate thickness of the radome wall should be –
a.)l
b.)l/4
c.)l/2
d.)l/
23 A relatively permanent information is stored in
a. )ROM
b.)RAM
c.)PROM
d.)Volatile memory


24. The rise time of the RC network shown in the given figure is approximately equal to –
b.) RC
c.) 2RC
d.) 4RC

25. If in the network shown in the fig. initially a steady state is attained by closing the switch 's' and then if the switch is opened at t = 0, then the current i(t) through the inductor will be –
a.) cos50tA
b.) 2A
c.) 2cos100tA
d.) 2sin50tA

26. When the p network of figure – I and T-network of figure – II are equivalent then the values of R1, R2 and R3 will be respectively –
a) 9W, 6W and 6W
b.) 6W, 6W and 9W
c.) 9W, 6W and 9W
d.) 6W, 9W and 6W

27. When the impedance matrices of a two port networks are given by and , then if these two networks are connected in series then the impedance matrix of the resulting two-port network will be –
d.) indeterminate

28. Joule/coulomb is the unit of -
a.) Electric field potential
b.) Potential
c .) Charge
d.) None of the above

29. The electric field line and equipotential lines-
a.) Are parallel to each other
b.)Are one and same
c.) Cut each other orthogonally
d.)Can be inclined to each other at any angle

30. For a lossy transmission line short circuited at the receiving end, the input impedance is given by (When Z0 is the characteristic impendence g is the propagation constant and L is the length of the line

31. When two equal positive point charges are placed along X- axis at X1 and –X1 respectively then the electric field vector at a point P on the positive Y-axis will be directed-
a.) In the +x direction
b.) In the –x direction
c. ) In the +y direction
d.) In the –y direction

32. The directions of and in TEM mode transmission line with respect to the direction of propagation are-
a.) Both and are transverse to the direction of propagation
b.) is and are transverse and h has a component in the direction of propagation
c.) is entirely transverse and has a component in the direction of propagation
d.) is entirely transverse and has a component in the direction of propagation

33. The lowest TM mode in a rectangular waveguide of cross –section a x b with a>b will be-
a.) TM01
b.)TE10
c.) TM112
d.)TE11

34. When a transmitter in a free space radiates a mean power of ‘p’ watts uniformly in all directions then at a distance d sufficiently far from the source in plane the electric field E should be related to p and d as –


35. When a dipole antenna was radiating with some excitation in free space radiating a certain amount of the power v if then this antenna is immersed in a lake where water is non-dissipative but has a dielectric constant of 81, then the radiated power with the same excitation will be
a.) Decrease to finite non-zero value
b.)Remain the same
c. )Increase
d.)Decrease to zero

36. When a (75 – j40)W load is connected to a coaxial line of Z0 = 75 W at 6MHz then the load matching on the line can be accomplished by connecting-
a.) A short – circuited stub at the load
b.)An inductance at the load
c. )A short circuited stub at a specific distance from the load
d.)none of the above

37. As compared to analog multimeters, digital multimeters are –
a.) less accurate
b.) more accurate
c.) equally accurate
d.) none.

38. When a signal of 10 mV at 75 MHz is to be measured then which of the following instruments can be used –
a.) VTVM
b.) Cathode ray oscilloscope
c.) Moving iron voltmeter
d.) Digital multimeter

39. Which of the following statement is true about two wattmeter method for power measurement in three phase current ?
a.) power can be measured using two wattmeter method only for star connected three phase circuits.
b.) when two meter show indentical readings, in the power factor is 0.5.
c.) when power factor is unit, one of the wattmeter reads zero
d.) when the reading of the two wattmeters are equal but of opposite sign, then the power factor is zero –
BSNL recruitment / placement examination paper for previous years 2007 2008 2009 sample aptitude / reasoning / technical questions free download here. Answers key / solutions coming soon!
40. When a capacitance transducer has two plates of area 5cm2 each, separated by an air gap of 2mm than the displacement sensitivity in pf/cm due to gap change would be –
a.) 11.1
b.) 44.2
c.) 52.3
d.) 66.3

41. The Q of a radio coil –
a.) is independent of frequency
b.) increases monotonically as frequency increases
c.) decreases monotonically as frequency increases
d.) increases upto a certain frequency and then decreases beyond that frequency

42. When a generator of internal impedance and operating at 1GHz feeds a load via a coaxial line of characteristic impedance 50 ohm then the voltage wave ratio on the feed line is –
a.) 0.5
b.) 1.5
c.) 2.5
d.) 1.75

43. The coding system typically used in digital telemetry is –
a.) PPM (pulse position modulation)
b.) PAM (pulse amplitude modulation)
c.) PCM (pulse code modulation)
d.) PDM (pulse duration modulation)

44. Radiation pyrometers are used for the measurement of temperature in the range of –
a.) -2000C to 5000C
b.) 00C to 5000C
c.) 5000C to 12000C
d.) 12000C to 25000C

45. In the given figure band structure is shown. It is of –
a.) Gallium Avesenide (GaAs)
b.) Silicon (Si)
c.) Copper (Cu)
d.) Germanium (Ge)

46. When anode is positive with respect to cathode in an SCR, the numbers of blocked p-n junction is –
a.) 1
b.) 2
c.) 3
d.) 4

47. The circuit symbol for a GTO is
a. b.
c. d.


48. In the given fig. mark out the type of Cyclo converters
a.) 1 phase to 1 phase with continuous conduction
b.) 1 phase to 1 phase with discontinuous conduction
c.) step up device
d.) 3 phase to 1 phase device

49. In the given fig. A-1, C=5, m H and C=20 m F, C is initially charged to 200 V. After the switch.
S is closed at t = 0 the
maximum value of current and the
time at which it reaches this value are respectively.
a.) 400 A, 15.707 mS
b.) 50 A, 30 mS
c.) 100 A, 62.828 mS
d.) 400 A, 31.414 mS

50. In the given circuit the maximum current in the main SCR M can be-
a.) 200 A
b.) 170.7 A
c.) 141.4 A
d.) 70.7 A

51. The transfer function of an amplifier is given by
The high 3-db frequency of the amplifier will approximately

a.) 5850 KHZ
b.)585 KHZ
c.) 5850 HZ
d.)585HZ

52. In comparison to full wave rectifier with two diodes the four divide bridge rectifier has the dominant advantage of -
a). Higher current carrying
b.)Lower ripple factor
c.) Higher efficiency
d.)Lower peak increase voltage require

53. Power output increase in a class-c amplifier-
a.) If the conduction angle decrease
b).If the conduction angle increase
c.) Are not governed by the conduction angle
d.)None of the above

54. A transistor with hie = 1.5 k and hfe = 75 is used in an emitter follower circuit where R1 and R2 are used for normal biasing . Approximate value of it’s current amplification is-
a.)75
b.)76
c.)75/76
d.)-75

55. Amplifier of class B has high theoretical efficiency of 78.5 percent because-
a.) It is biased almost to saturation
b.)Its quiescent current is low
c.)It’s output is an exact replica of it’s input
d.)It is biased well below cut off

56. The coupling that produces minimum interference with frequency response is-
a.) Direct coupling
b.)Impedance coupling
c.) R C coupling
d.)Transformer coupling

57. In the circuit shown in the given figure Rf provides
a.) Current series feedback
b.)Current shunt feedback
c.) Voltage series feedback
d.)Voltage shunt feedback

58. Mark the correct relation for the junction transistor

59. Data in the serial form can be converted into parallel form by using –
a.) PISO shift register
b.) SOIP shift register
c.) SIPO shift register
d.) POIS shift register

60. PROMs are used to store-
a.) bulk information
b.) information to be accessed rarely
c.) sequence information
d.) relatively permanent information

61. The horizontal axis in a 3 bit unipolar D/A converter represents-
a.) Output bit combination
b.) analog output voltage
c.) input bit combination
d.) none of the above

62. 'Not allowed' condition in NAND gate SR flip flop is –
a.) s = 0, R = 0
b.) s = 1, R = 1
c.) s = 0, R = 1
d.) s = 1, R = 0

63. Name the fastest logic family-
a) TTL
b. RTL
c.) DCTL
d.) ECL

64. Equation corresponding to De Morgan's theorem in Boolean Algebra is –
a.) (A+B) (A+B) = AA + AB + BA + BB
c.) A + AB = A
d.) None of the above

65. In the given fig find radix of the system –
a.) 2b.) 4
c.) 6
d.) 8

66. Modems are used for data transmission telephone lines to –
a.) increase the transmission capacity
b) improve noice performance
c.) incorporate error control coding
d.) eliminate dc component in the transmitted signal

67. The figure of a control system is shown. The maximum value of gain K for which the system is stable is-
a.)
b.) 3
c.) 4
d.) 5

68. Identify the example of open-loop system-
a.) A windscreen wiper
b.) Aqualung
c.) Respiratory system of an animal
d.) A system for controlling Anti-rocket missiles.

69. Consider the following expressions indicating the step or impulse response of an initially relaxed control system-
1. (5 – 4e-2+) u(t)
2. (e-2t +5) (u(t))
3 .V(t) + 8e-2t u(t)
4 . V(t) + 4e-2t 4(t)
Those which correspond to the step and impulse response of the same system include-
a.) 1&3
b.) 1&4
c.) 2&4
d.) 1&4
BSNL GE JTO Recruitment / placement last exam paper previous years 2007 2008 2009 free sample papers here.
70. A system is described by
To test its stability by Lyapunov’s method the following V functions are considered.
Mark the most suitable V-function in this case-
a.) Only V1
b.)Only V2
c.) Both V1 and V2
d.) Neither V1 nor v2
71. Identity the polar plot of a typical type zero system with open loop transfer function

72. The scattering matrix of a magic –tee shown in the given figure is-




73. Which is the following relate to rational transfer function of a system-
1. Ratio of Fourier transform of output to input with zero initial conditions.
2. Ratio of Laplace transform of output to input with zero initial conditions.
3. Laplace transform of system impulse response.
4. Laplace transform of system unit step response select the correct answer using the codes given below.
Codes
a.) 1 and 4
b.) 2 and 3
c.) 1 and 3
d.) 2 and 4

74. For the signal g (t) – 10 cos (50 pt) cos2 (150at)
The Nyquist sampling state in t seconds is
a.) 150 samples per second
b.) 200 samples per second
c.) 300 samples per second
d.) 350 samples per second

75. In the case of a 70 MHz 1F carries for a transponder band width of 36 MHz; energy must lie between – MHz.
a.) 34 and 106
b.) 52. And 88
c.) 106 and 142
d.) 34 and 142

76. Radar used to eliminate clutter in navigational application is –
a.) Pulse radar
b.) Tracking radar
c.) MTI radar
d.) Mono pulse radar
77. The 1.55 mm windows is not yet in use with fiber optic systems because –
a.)The attenuation is higher than at 0.85 mm
b) The attenuation is higher than at 1.3mm
c.) Suitable laser devices have not yet been developed
d.) It does not lend itself to wavelength multiplexing

78. Pre-emphasis in FM systems involves-
a.) Compression of the modulating signal
b.) Expansion of the modulating signal
c.) Amplification of lower frequency components of the modulating signal.
d.) Amplification of higher frequency components of the modulating signal.

79. In a terrestrial microwave system transmission of signals is achieved through-
a.) reflection from the ionosphere
b.) line of sight mode
c) reflection from the ground
d.) diffraction from the stratosphere.

80. Casse grain feed is used with a parabolic reflector to
a.) increase the gain of the system
b). increase the bandwidth of the system
c.) reduce the size of the main reflector
d.) allow the feed to be placed at a convenient point.

81. In most microwave communication link rain drop attenuation is caused due to-
a.) scattering of microwaves by water drops of specific size.
b) scattering of microwaves by a collection of droplets acing as a single body.
c.) absorption of microwaves by water and consequent heating of the liquid
d.) absorption of the microwaves by water vapor in the atmosphere.

82. Circuit in the given figure represents. –
a.) an astable multivibrator
b.) A monostable multivibrator
c.) Voltage controlled oscillator
d.) Ramp generator

83. . D = r is-
a.) Maxwell's 1st equation
b.) Maxwell's II equation
c.) Maxwell's III equation
d.) Maxwell’s IV equation

84. In a rectangular wave-guide which TM mode exists-
a.) TM00
b.) TM01
c.) Tm10
d.) TM11

85. In directional coupler a portion of power two velliry fram port 1) to port 2) is coupled to.
a). port 4
b). port 3
c. port 2.
d.) port 3 & 4.

86. For high power i.e. 10 w to 50 kw measurement –
a.) Barometer are used
b.) Thermisters are used
c.) Calorimetric technique
d.) Calorimetric watt meter technique used

87. The difference between TWT & klystron is –
a.) In TWT electrons are in contact with RF field for long time & in klystron for short time
b.) In klystron electrons are in contact with RF field for long time & in TWT for short time
c.) In klystron there is no contact in RF field & electrons while in TWT there is contact
d.) In TWT phase is no contact is RF field & electrons while in klystron there is contact

88. Which one is most suitable for transmission through wave guide-
a.) Hown antennas
b.) Bioconical antennas
c.) helical antenna
d. Discone

89. The skip distance of microwave is given by –
a.)
b.)
c.)
d.)

90. How many general purpose registers 8085mp-
a.) 4
b.) 6
c.) 8
c.) 10

91. 8085 mP has no. of addressing modes-
a.) 2
b.) 3
c.) 4
d.) 5

92. What will be status of z and c y flag after execution of SUB A instruction
a.) z = 0, cy = 0
b.) z = 0, cy = 1
c.) z = 1, cy = 0
d.) z = 1, cy = 1
93. Microprocessor accept interrupt only if.
a.) interrupt flip flop disabled.
b.) when INTA signal is low.
c. interrupt flip flop enabled.
d.) none of above.

94. Microprogramming is a technique
a.) for programming the microprocessor
b.) for writing small programs efficiently
c.) for programming the control steps of computer
d.) for programming o/p / i/p

95. High level programs like C are converted into machine language with the help of
a.) interpreter
b.) compiler
c.) operating
d.) system

96. (10110011)2 = (?)8
a.) 253
b.) 263
c.) 273
d.) 283

97. A Not gate at the output of AND gate converts AND gate into-
a.) NAND
b.) NOR
c.) AND
d.) NOPE.

98. The O/P of a logic gate is the gate must be-
a.) AND
b.) OR
c.) NAND
d.) X-OR

99. 38. A symbol of JK flip flop is-
BSNL Free download previous years 2007 2008 2009 recruitment question papers for GE JTO exam sample papers. Answer keys / solutions coming soon!
100. A demultiplener-
a.) has multiple i/p and single o/p
b.) has multiple i/p and multiple o/p
c.) has multiple i/p and multiple o/p
d.) has single i/p and single o/p

101. Which of the following best describes the authour`s attitude toward fairy tales ?
a.) fascination
b.) open approval.
c.) Indulgent tolerance.
d.) Scornful.

102. What type of sentence is this ?
Hurray! We won the match
a.) Exclamatory
b.) assertive
c.) Negative
d.) Affirmative

103. Before which of the following word will you put 'a'
a.) hour
b.) M. A.
c.) Umbrella
d.) Man

104. The noun form of 'fresh' is –
a.) freshly
b.) freshen
c.) fresheners
d.) fresh itself

105. The word 'clang' is an example of –
a.) Simile
b.) inversion
c.) onomatopoeia
d.) irony

106. The Forbes magazine acclaimed Azim Premji as richest India's is the chairman of-
a.) Pentafour software
b) Infosys
c.) IBM
d.) Wipro

107. Bharat Ratna award for the year 2001 goes to-
a.) Lata Mangeshkar and Zakeer Hussain
b.) Zakeer Hussain and Bismillah Khan
c.) Bismillah Khan and Lata Mangeshkar
d.) Lata Mangeshkar and Ustad Amzad Ali Khan

108. Mr. George W-Bush takes over as ------ President of the united states of America succeeding Mr. Bill Clinton-
a.) 42nd
b.) 43rd
c.) 40th
d.) 45th

109. New Chief Minister of Pondicherry is-
a.) T. Venkat Naidu
b.) K. Hari Harh
c.) N. Rengaswany
d.) M. Mudliar

110. No court has the jurisdiction to interfere with the election process once set in motion by the Election commission. This is enshrined in Article-
a.) 311
b.) 329
c.) 356
d.) 365

111. Ostrich is a-
a.) Running bird
b.) Flying bird
c) Swimming bird
d.) Migratory bird

112. The main atmospheric gas responsible for green house is-
a.) Oxygen
b.) Nitrogen
c.) Ozone
d.) Carbon-dioxide

113. Which of the following is not a Kharif Crop-
a.) Rice
b.) groundnut
c.) Sugarcane
d.) gram

114. The function of World Bank is to-
a.) Help in reconstruction and development of world economy
b.) Facilitate poor countries to trade on concessional rates
c.) Promote growth of international trade and equilibrium in balance of payments
d.) Ease trade barriers and establish rule of fair trade

115. Speed of sound is maximum in-
a. )Water
b.) Air
c.) Steel
d.) Vacuum
116. “Long years ago we made a trust with destiny.” Whose words are these-
a.) Subhash Chandra Bose
b.) Jawaharlal Nehru
c.) Lajpat Rai
d.) Bhagat Singh

117. Durand cup is associated with-
a.) Hockey
b.) Tennis
c.) Football
d.) Badminton

118. Rabindranath Tagore was awarded the Nobel Prize in literature in the year.
a.) 1908
b.) 1910
c.) 1913
d.) 1914

119. India successfully conducted its first underground nuclear experiment at Pokhran in Rajas than on-
a.) May 18, 1975
b.) May 20, 1974
c) May 17, 1974
d.) May 17, 1974

120. An emergency loan of $ 500 million to help reconstruct infrastructure in earth quake devastated Gujarat approved by-
a.) Asian development Bank
b.) World Bank
c.) Swiss Bank
d.) Reserve Bank of India BSNL GE-JTO Recruitment Examination

TCS placement paper

TCS Tech Interview, GD Topics & Tips, HR Interview Questions asked in a College Placement Paper
TCS TECH INTERVIEW

My tech interview was 80% project based. Some of the single questions I remember are as follows

Any application softwares u know?
diff btwn dbms & rdbms??? What r codd rules?
how many types of relationship? Eg. Of many-to-many relationship?
relationship btwn a foreign and primary key? Smart-key??
eg of left-outer join? Recursive join??
one complex query involving join!
why have u used access instead of oracle in your project?
I: (remember don't mumble in the interview. If ur saying something 'false' show the confidence in u that your answer is correct.) Our client told me so. (then smile to yourself!!)
types of dbms?? Give eg of each!
give an eg of a table which is in 3nf not in bcnf? Eg of reverse??
goal in 5 yours? Can u achieve that??
what is software configuration management?? What is QA??
what is CMM? Why level 5? Advantages of spiral model??

***70% of the interviews are dbms related even if u haven't mentioned dbms as a favorite. Show confidence in all answers. Jus prepare your basics in dbms, ds, os, software engg, oops, c, c++, corejava , sql server, networking (optional) and get your ATTITUDE RIGHT***

HR INTERVIEWS

My hr interview was mixture of discussion, friendly chat, hr, management interview and technical.

meaning of your name? What's special about your birthday? Expand your name to show your personality?
have u prepared for this interview? Sources?
what the common questions asked in hr interviews?
one of us is from tech one from hr. guess who's from hr and who's from tech?
are we Bengali or any other religion?
tell us any website from where u can get all tcs previous questions?
your sun-sign? (mine is Aquarius) common characteristics of Aquarius?
Justify that u r an Aquarius?
do u have a girlfriend?
I: yes. I don't differentiate between boyfriend and girlfriend . Thats why I have a lot of them!!
will u marry your girlfriend?
I: I am only 23. I want to give my spouse all comforts of life that's why I will marry after achieving all pleasures and comforts of life!
do u want your spouse to be from IT industry or a non-it?
do u want your spouse to cook food 4 u or to b a careeristic?
I: I want her to b self-dependant to live her life of her own!
if she hags out with her boss?? Come late at night?
I: I have faith in her. As long there is love-bond btwn us there is no problem and she will not do anything to hurt my feelings. (She was impressed!)
if she works in an equally competitive environment in a company better than yours??
I: (at this point I was frustrated. I want to stop the gal frnd episode) Carrer is my first gal friend. Others come after that.
derive complexity for bubblesort
whats the worst case complexity of qiucksort. Practically describe insertion sort.
depth of a binary tree. Derive expression?? Height of binary tree??
eg of recursive function? Show by an eg.
disadvantage of circular linked list? Insert in a doubly linked list.
hobbies? in priority wise?
I: software collection, listening to English hard rock, reading autobiography
whose autobiography?
I: business @ speed of thought by bill gates..
what kind of books u read?? Fiction or non-fiction?
what the latest version of windows?
I: windows Longhorn!!
what type of hard-rock? do ever people around u complain to loud noise? Why u listen to hard-rock? Name some famous rock stars.
career plan?? How can u contribute to tcs?
mention some point abt yourself not written in your bio-data? Beware if u say something common your candidature will simply be cancelled?ready to sign agreement bond now?what other companies u appeared for?? Why were u rejected ??
do u have any question?
I: career path in tcs?? How can u become a project manager with tcs provided u perform well? How tcs is going to be among global top 10 by 2010?
How was my performance? How can I improve myself?

I believe that is the greatest tcs resource one can find in internet. So get benefited from it! Just remember to get your attitude right. Guys remember besides apti and interviews dress code, smartness, eye contact, positive attitude, friendliness, blue form, communication skill, extra curricular activity, general knowledge, presentation, iq, mental ability, decision taking ability are also tested during interviews. This is from a personal experience besides ask the interviewer as many questions as u can. Show the interviewer you are dying 2 get in his organisation.